Design

Design of Heating, Ventilation, Air Conditioning and Refrigeration systems using the modern BIM models

 

What are the main steps in the design of Heating, Ventilation, Air Conditioning and Refrigeration Systems:

  • Site evaluation and client needs analysis
  • Assess the potential for the deployment of renewable energy in building installations
  • Initial selection of the type of installations meeting the modern requirements for construction of low-energy buildings with close to zero energy consumption
  • Preparation of a conceptual solution with an economic assessment of the investment, which establishes its relevance
  • Preparation of a conceptual project for coordinating the main systems and their characteristics with other specialties:
  • Architecture
  • Constructions
  • Electro
  • Plumbing
  • Preparation of EE – Energy Efficiency Project, which specifies the properties and thermodynamic characteristics of the enclosing elements: Walls, Windows, Doors, Floor, Roof, Bay Windows
  • Preparation of a technical design for HVAC specialty including:
  • Explanatory note
  • Calculations
  • Selections
  • Schemes
  • Bill of Quantities with specific requirements for the equipment and materials
  • Assessment of the expected annual energy consumption and criteria